Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Modelo: 71
Lifting Height: 28‑32.7 m
Handling Capacity: 3‑60 m³/h
Traction Type: Mining high‑strength ring‑chain drive
Feeding & Discharging: Inflow feeding, induced discharge
MTBF: More than 20000 working hours
Compliance Standard: JB3926‑85, MT36‑80
Wear Parts: Material buckets, ring‑chains, sprockets
Applicable Material: Ore, coal, sand, clay, cement, crushed stone
Feature: Low power consumption, dust‑sealed housing, long service life
Installation: Vertical standalone installation
Solicitud: Mineral Processing Plant, Coal Washing, Building‑materials
| Parameter Item | Technical Value | Localization Adaptation Note for Global Mining Buyers |
|---|---|---|
| Maximum Lifting Height | 28‑32.7 m | Tall vertical layout saves workshop floor area; sectional split casing for easy container sea‑freight and on‑site bolt‑assembly without large‑scale hoisting machinery |
| Volumetric Handling Capacity | 3‑60 m³/h | Broad throughput range fits small pilot‑scale ore workshops up to medium‑size concentrator production lines |
| Traction Component | High‑strength mining ring chain complying with MT36‑80 standard | Wear‑resistant alloy chain tolerates elevated‑temperature feed materials; spare chain segments can be consolidated‑shipped to cut ocean‑freight |
| Feeding & Discharging Mode | Inflow feeding, induced gravity discharge | Minimal material back‑flow & digging‑resistance; lowers onsite power consumption for high‑cost‑electricity mining regions |
| Applicable Feedstock | Powder, granular & small‑block materials: coal, ore, sand, clay, cement, crushed stone | Suitable for low‑to‑moderate abrasive bulk feed for Bucket Elevator for Mineral Processing Plant |
| Material Temperature Tolerance | Accept high‑temperature bulk feed via ring‑chain traction | Chain‑type construction allows hotter feed compared to belt‑driven vertical lifters |
| Reliability Standard | Designed per JB3926‑85 Vertical Bucket Elevator standard, aligned with international benchmarks | Interchangeable wear‑parts following global common dimensions, convenient for local maintenance teams |
| Enclosure Structure | Fully sealed metal housing (Dust‑Sealed Bucket Elevator) | Suppresses dust leakage, meets environmental requirements for tropical open‑air mineral workshops |
| Mean Time Between Failures | Over 20 000 working‑hours | Optimized mechanical design reduces unplanned repair frequency for remote mines short‑skilled technicians |
| Vulnerable Wear Components | Material buckets, mining ring‑chains, sprocket assemblies | Pre‑packed spare‑part kits available for fast replacement at overseas project sites |
| Application Scenario | B‑Side Buyer Profile | Local Market Pain Points | Quantified Product Advantages & Selling Points |
|---|---|---|---|
| Vertical ore feeding inside mineral‑processing concentrator | Concentrator plant manager, mineral‑project EPC contractor | Conventional vertical lifters produce heavy dust spillage; frequent material back‑flow leads 4‑6 % raw‑ore loss; high energy consumption raises operational expenditure | Bucket Elevator for Mineral Processing Plant with fully sealed housing cuts dust emission by 83 %; inflow‑feed design reduces material back‑flow loss below 0.7 %; drives down unit power draw by 27 % |
| High‑throughput coal & crushed‑stone vertical elevation for coal‑washing circuit | Coal‑mine operator, quarry procurement department | Old‑model elevators suffer frequent chain fracture; monthly unplanned downtime reaches 3‑4 days; maintenance labour input remains high | High Capacity Bucket Elevator uses MT36‑80 heavy‑duty mining ring‑chain; extends chain‑replacement cycle by 48 %; mean‑time‑between‑failures exceeds 20 000 working‑hours; cuts breakdown‑related downtime by 72 % |
| Dust‑controlled raw‑material lifting for cement‑mineral composite processing site | Building‑material‑mining‑group procurement officer | Local environmental regulations restrict open dust emission; legacy lifting equipment causes workshop air pollution and material waste | Dust‑Sealed Bucket Elevator closed‑casing design; dust‑leakage rate drops under 1.2 %; minimizes fine‑powder raw‑material loss; satisfies regional environmental compliance demands |
| Pilot‑plant & small‑scale multi‑material vertical handling | Mineral‑processing test institute, small‑size mine investor | Limited plant footprint; need single unit for mixed‑feed lifting (ore, sand, coal); avoid investing multiple standalone lifting machines | Compact vertical layout occupies 64 % less floor‑space than inclined belt conveyors for equal lifting height; handles multiple bulk materials; reduces overall Mineral Processing Equipment capital outlay by 23 % |
P1: ¿Qué tipos de materiales a granel puede manejar este elevador de cangilones? ¿Puede funcionar con piensos minerales a alta temperatura?
R: Está diseñado para materiales abrasivos en polvo, granulares y de bloques pequeños de baja a moderada, como minerales, carbón, arena y cemento. Gracias a la construcción de tracción con cadena de anillos, tolera una alimentación a temperaturas más altas en comparación con los elevadores verticales accionados por correa. Comparta los datos sobre la temperatura del material de alimentación y el tamaño de las partículas y nuestros ingenieros validarán la viabilidad.
P2: ¿Es el elevador de cangilones sellado contra el polvo adecuado para actualizar mi diagrama de flujo de procesamiento de minerales existente? ¿Necesito modificaciones importantes de obra civil?
R: Sí. El ascensor adopta una instalación vertical independiente; Sólo se necesitan simples cimientos de hormigón con base de anclaje, no se necesitan reconstrucciones de edificios a gran escala. Proporcionamos dibujos de dimensiones CAD completos para la evaluación del diseño, combinando perfectamente con otros equipos de procesamiento de minerales en su circuito de beneficio.
P3: Suministro de repuestos para cadenas de anillos y cangilones de minería en minas remotas en el extranjero; ¿Cuál será el plazo de entrega del envío?
R: Las piezas de desgaste críticas, incluidas las cadenas de anillos y los cangilones para minería, se mantienen en stock. Los kits de repuestos se pueden consolidar y enviar con el equipo principal para reducir el costo del transporte marítimo; El plazo de entrega estándar de piezas de repuesto oscila entre 7 y 14 días laborables.
¿Está listo para reducir el desperdicio de material del transporte vertical, reducir el consumo de energía y minimizar el tiempo de inactividad no planificado para su planta de procesamiento de material a granel?
También podría gustarte
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.